广东车间降温工程公司和你分析轴流风机该如何来调试
公司,承接各种环保空调车间降温工程、负压风机车间降温工程、净化车间降温工程、除尘车间降温工程、消防排烟工程、通风降温设备安装维修工程、厂房车间降温工程、厂房降温工程、厂房通风降温工程等工程,欢迎咨询:***
今天车间降温工程公司和你分享轴流风机该如何来调试,如下:
调试方式1、安置完毕后,在启动前应检查风机转动的灵活性,用手拨动叶片是否有卡壳摩擦现象。检查风机及相邻管道内是否有遗留东西和别的杂物。
调试方式2、检查管道内的风门是否处于开启状态。
调试方式3、人员应远离风机。
调试方式4、启动风机,检查扇叶转向是否与旋转标识标记的相符合,表示在检查合格后,试运行10-30分钟后停止,检查叶片有无松动现象,减振座与底子连接螺栓有无松动,一切正常后,才正式启动,投入运行。
Guangdong plant cooling engineering company, to undertake a variety of environmental protection and air conditioning plant cooling, vacuum blower workshop cooling, cooling, purification plant, dust removal plant cooling, fire smoke, ventilation cooling equipment installation and maintenance engineering, plant workshop cooling engineering, plant ventilation cooling engineering, etc., welcome advice: ***
Today, the workshop cooling engineering company and you share the axial flow fan how to debug, as follows:
Debug mode 1, a shaft flow fan installed, before initiating should check the fan rotation flexibility with slide hand blade is stuck phenomenon of friction. Check the wind turbine and the adjacent pipe in the remaining things and other debris.
2, check valve debugging mode in the pipeline is in the open state.
Debug mode 3, personnel should be far from the fan.
Debug mode 4, start the fan, check the fan blade to rotate and logo marking of the phase, the workshop cooling engineering company said in the examination qualified, after the test run 10-30 minutes to stop, check the blade has no loose phenomenon, shock absorber and basic connection bolts are loose, a normal, before the official start, put into operation.